How long does fibre leased line installation take?

Because a fibre leased line is a fibre optic cable dedicated for your business lead time for installation is dependant on your location.

Typically a fibre leased line can be installed from as little as 30 days if your premises already has fibre installed. Typically this maybe because you have an ISDN30 telephony circuit, an existing fibre circuit or the previous occupier had installed a fibre.

If you don’t have an existing fibre circuit in your premises then lead times can increase from 30 days to 90 days or more. This is because fibre contractors need to plan a route to your building from the local fibre leased line pop or telephone exchange.

Using Voice 2 Voice Ltd to compare fibre leased lines enables you to choose and select the right carrier ensuring you not only get the best price but also the fastest installation times possible.

Author: Warren Stroud